The Meadows (Stages 1 & 2)

The Project

Located in Bangalow within Byron Shire, The Meadows is a 43 lot residential subdivision developed to support the growing local community while complementing the character of the surrounding area.

J&M Bashforth & Sons was engaged as the civil contractor to deliver the complete civil infrastructure package across stages 1 and 2 of the development. The project involved preparing and servicing the site for future residential construction, including major earthworks, drainage, roadworks and landscaping.

Works also included installing a playground and upgrading surrounding roads and infrastructure to support long-term community use.

Works Involved

  • Bulk earthworks
  • Sewer
  • Stormwater drainage
  • Water
  • Tree clearing
  • Bioretention basin
  • Roadworks and upgrades to existing roads and surrounds
  • Concrete footpaths and driveways
  • Playground installation
  • Retaining walls
  • Landscaping

Challenges

Delivering a large-scale residential subdivision in an established area required careful coordination of drainage, road upgrades and surrounding infrastructure works while maintaining safe site access throughout construction.

The installation of a bioretention basin and landscaping elements also required close attention to environmental outcomes and long-term stormwater management performance.

Works were completed between 2015 and 2017.

Contact Us to Discuss Your Next Project

Need help with a similar project?

We operate between Tweed Heads and Ballina, covering the entire Northern Rivers.